What type of system can be utilized for deep dewatering on a construction site?

Prepare for the A-5 Excavating, Grading and Oil Surfacing Test with flashcards and multiple choice questions. Succeed with detailed explanations and hints for each question. Ensure your success in the exam!

Utilizing several wells around the perimeter of the site is an effective method for deep dewatering in construction. This system, often referred to as wellpoint dewatering, involves drilling boreholes and installing pumps to lower groundwater levels. By placing multiple wells strategically around the construction area, the method allows for efficient water removal from deep soil layers, which is crucial for maintaining a dry work environment and preventing water-related issues such as soil instability and construction delays.

The perimeter well system is particularly advantageous in situations where groundwater levels are high or when the construction occurs in areas with significant water flow. By drawing water away from the construction site, it reduces the risk of flooding and allows for safe excavation and grading activities. This method can also be adjusted based on the specific conditions of the site, such as changes in soil composition or groundwater content.

Understanding the relevance of this option emphasizes the need for tailored dewatering strategies in various construction scenarios to ensure safety and efficiency.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy